CMS School
LOCATION
Coimbatore
TOTAL AREA (SQFT)
8000 Sqft
TIME TAKEN TO COMPLETE
4 months
TYPE OF BUILDING/SOLUTION
Steel structural floor addition with composite roof slab
CLIENT BRIEF/THE OBJECTIVE
- Complete within short period
- Faster completion of floor
- Light in weight
- Composite roof
CHALLENGES (IF ANY)
( Any challenges which was faced in coming Up with the solution.) Govt. rules and regulations / Old structure they were unaware about strength of building
THE CONSTRUCTION PROCESS
(short description on the scale of construction process, materials used, technology etc)
- HR steel for main frames/Steel tubular frames for walls/ fibre cement board wall cladding /
THE SOLUTION
( Any challenges which was faced in coming Up with the solution.) - Govt. rules and regulations / Old structure they were unaware about strength of building
BENEFITS/ADVANTAGES
After completion : Customer was happy as they got enough space by adding floor.Loaded weight was also less.
Sree Ramakrishna hospital
LOCATION
Coimbatore
TOTAL AREA (SQFT)
70000 Sqft
TIME TAKEN TO COMPLETE
10 months
TYPE OF BUILDING/SOLUTION
Design and build steel structural project / Institutional
CLIENT BRIEF/THE OBJECTIVE
Faster execution / Sustainable construction practices / Looking for a single vendor for taking up full responsibility of design and construction
SOLUTIONS
- Built up H section for columns & Beams
- 5 mm thick tubular structure for architectural roof
- Steel architectural louvers
- Steel framed façade with ACP skin on the exterior
- Internal cladding with calcium silicate double layer boards
- Fire proof using cementacious fire proofing compound
- One of the first high rise building in Tamilnadu
- Approvals got after careful structural proof checking by the authorities as it’s a first of its kind building
Sri Lakosha Polymers
LOCATION
Coimbatore
TOTAL AREA (SQFT)
25000 Sqft
TIME TAKEN TO COMPLETE
4 months
TYPE OF BUILDING/SOLUTION
Ware house building with office
CLIENT BRIEF/THE OBJECTIVE
Short description about what the Project objective is or what the client wanted.
CHALLENGES (IF ANY)
Work to be completed within summer school holiday time
THE CONSTRUCTION PROCESS
(short description on the scale of construction process, materials used, technology etc)
THE SOLUTION
The actual solution, what Steelion proposed to The client to meet the objective.
KSEB
LOCATION
Shornur , Kulappulli
TOTAL AREA (SQFT)
15000 Sqft
TIME TAKEN TO COMPLETE
12 months
TYPE OF BUILDING/SOLUTION
Design build steel structural project / Multi storied building – public sector
CLIENT BRIEF/THE OBJECTIVE
Wanted to promote sustainable & Innovative construction practice
CHALLENGES (IF ANY)
Work to be completed within summer school holiday time
THE CONSTRUCTION PROCESS
- Built up steel beams and columns
- Composite floor slabs with 1.2mm deck slab & M30 grade concrete
- Interior walls with double calcium silicate boards of 1.2mm thick
- Structural steel fire proofed with cementacious fire proofing compound
THE SOLUTION
The actual solution, what Steelion proposed to The client to meet the objective.